Overview
Quick Details
- Place of Origin:
-
Zhejiang, China
- Brand Name:
-
EPT
- Model Number:
-
NMRW
- Rated Power:
-
0.06KW ~15KW
- Gearing Arrangement:
-
Worm
- Output Torque:
-
1.77N.m~1755.7 N.m
- Input Speed:
-
1400rpm
- Output Speed:
-
14rpm~280rpm
- Certification:
-
CE, CCC, ISO, CQM
- ratio:
-
5~100
- Housing:
-
die-cast aluminum alloy; cast iron
- Worm:
-
0Cr steel, carburization and nitriding treatment
Supply Ability
- Supply Ability:
- 10000 Set/Sets per Month
Packaging & Delivery
- Packaging Details
- Standard carton/Pallet/Standard wooden case (depends on order quantity).
- Port
- SHANGHAI
-
Lead Time
: - 15-20 working days upon payment
Online Customization
1400 rpm motor speed reduce gearbox
Company Information
Companyname:GuomaoReducerGroupCo.,Ltd
Address:WujinDistrict,ChangzhouCity,JiangsuProvince,China.
Foundingyear:1993
Quantityofemployees:2000employees
Factorysquare:360000squaremeters
Features
1.High quality die casting aluminum alloy housing, suitable for universal mounting.
2.Heat sink design for cooling provides great surface area and higher thermal capacity than the casting iron housings.
3.025 to 150, with power scope from 60W to15KW.
4.Larger speed ratio range. Each single frame size has 12 ratios from 5:1 to 100:1.
5.Hardened worm with fine grinding has the features of higher efficiency and big output torque.
6.Low noise and stable running, can adapt long term work condition in terrible environments.
7.Light weight, high mechanical strength.
8.Modularization combination PCRW and DRW extend the ration RW reducers from i=5:1 to 3200:1.
Main materials
Housing: die-cast aluminum alloy (frame size: 025 up to 90) , cast iron(frame size: 110 to 150).
Worm: 20Cr steel, carburization and nitriding treatment(the hardness of tooth is HRC60).
Worm wheel: special wearable nickel bronze alloy.
Paint
Aluminum alloy housing:
1.Shot blasting and special antiseptic treatment on the aluminum alloy surface.
2.After phosphating, coated with blue RAL5010 baking finished.
Cast iron housing: painted with RAL5010 blue baking finished.
Detailed Images
Packaging & Shipping
Factory Show
Certifications
Trade Partners
FAQ
1.PaymentTerm:30%TTinadvance+70%balancebeforeshipmentortotaladvance.
2.Deliverytime:about20to30daysfromreceivepayment.
3.Weacceptcustomizedproductsasperyourspecialrequirement.
4.GuidelinesfortheSelection:Usuallywecanselectonemachinewhichissuitableforyouwithsomeinformationsfromyou,suchasratio/motorspeed/mountingdimension/outtorqueetc.
5.Iftheminimumorderamountisinexcessof$10000,therearepreferential.